I prepped and painted three bedrooms along with a hallway. There was a lot of preparation in the three bedrooms and took me a full day to prep all three. One bedroom I had to put one coat of primer on and then two finish coats to cover all the repair work completed.
Photos:
Sunday, November 18, 2012
Saturday, November 10, 2012
Fishers Interior Rooms
I completed an interior job this past week by myself as Ryan has taken another job. I completed the master bedroom, hallways, entryway, basement stairwell, dining room, and music room. I put two coats of eg-shell on all the walls except the hallways where the color was the same.
Steps:
Steps:
- Sanded all the walls;
- Washed all the walls;
- Spackled all the holes and other dings;
- Lightly sanded all the areas I spackled with 220 grade sandpaper;
- Taped out all the trim in order to keep paint off the trim;
- Applied first coat of paint and let dry for 4 hours;
- Applied second coat of paint;
- Pulled all the tape;
- Caulked all the cracks along the baseboards and door and window trim;
- Touched up all trim in order to ensure tight cut-lines; and
- Vacuumed.