Sunday, November 18, 2012

Fishers bedrooms

I prepped and painted three bedrooms along with a hallway. There was a lot of preparation in the three bedrooms and took me a full day to prep all three. One bedroom I had to put one coat of primer on and then two finish coats to cover all the repair work completed.

Photos:





Saturday, November 10, 2012

Fishers Interior Rooms

I completed an interior job this past week by myself as Ryan has taken another job. I completed the master bedroom, hallways, entryway, basement stairwell, dining room, and music room. I put two coats of eg-shell on all the walls except the hallways where the color was the same.

Steps:
  1. Sanded all the walls;
  2. Washed all the walls;
  3. Spackled all the holes and other dings;
  4. Lightly sanded all the areas I spackled with 220 grade sandpaper;
  5. Taped out all the trim in order to keep paint off the trim;
  6. Applied first coat of paint and let dry for 4 hours;
  7. Applied second coat of paint;
  8. Pulled all the tape;
  9. Caulked all the cracks along the baseboards and door and window trim;
  10. Touched up all trim in order to ensure tight cut-lines; and 
  11. Vacuumed.
Photos: