Steps:
- Pressure washed all the wood trim. Let dry for one day;
- Scraped, caulked, and primed;
- Applied 3 gallons of paint on all the wood trim, gutters, and garage steel door;
- Cleaned up and did a walk-through with customer.
- A lot of preparation including scraping, feathering, and caulking;
- Replaced a rotting board on a high peak tucked back on the roof line;
- Very high peaks and some tough roof lines.