Sunday, February 17, 2013

Fishers interior painting project

I finished up a large entryway that also included working over the stairwell, two hallways, and two closets. I also painted the baseboards. I had to bring in my 24' extension ladder and also my levelers when working over the stairwell.  The walls needed quite a bit of work so I spent most of the first day sanding and cleaning. I spent the second day putting the first coat on the walls after taping and masking and then finished up on the third day with the 2nd coat.   For the walls, I used Sherwin Williams ProMar 200 in an eg-shell sheen. The color was Steeple Gray, a Lowe's color that Sherwin Williams matched.

Challenges:

1 - High walls;
2 - Working over the stairwell and reaching the top of the walls;
3 - Working around a low hanging chandelier;
4 - A lot of preparation; and
5 - Working over a wood floor (put durable paper on the entire floor to prevent paint spray and scratching.)

Photos:

Entryway - 18' to the ceiling



 Top of walls looking from upstairs hallway



Top of walls



 Downstairs hallway

 Upstairs view

 Upstairs view


 Upstairs small hallway


 Upstairs hallway

 Upstairs hallway