Friday, June 14, 2013

Carmel ceilings and walls

Finished ceilings in an upstairs hallway, stairwell, and entryway. I also put two coats of "Ancient Marble" in a flat finish on the walls and touched up the stained trim. Painting ceilings in a high stairwell takes additional measures for safety and getting to the top. I brought in my 12 foot ladder along with levelers in order to get to the higher areas.


Steps:
  1. Removed electrical plates;
  2. Sanded walls;
  3. Washed the walls with simple green; 
  4. Spackled all the holes and nicks in the walls;
  5. Masked out floors with durable paper in order to keep any drips off the carpet and wood floors;
  6. Lightly sanding all areas spackled;
  7. Painted ceilings;
  8. Taped out baseboards and door trim;
  9. Applied first coat on walls - let dry;
  10. Applied second coat on walls;
  11. Pulled tape and masking paper;
  12. Did touch-ups requested;
  13. Cleaned up and presented to customer.
Photos (pictures not very clear):

Downstairs hallway


Entryway


Upstairs hallway

Thursday, May 23, 2013

Noblesville Interior Home

Just finished prepping and painting an entire home located in Noblesville. I put two coats of eg-shell on all the walls in two colors - Kilim Beige and Divine White. I did paint one bedroom in a blue color. I also painted both sides of a new steel front door. This was my largest painting project and it took me eight days.


Steps:
  1. Removed electrical plates;
  2. Sanded walls;
  3. Spackled a lot of nail pops and other small holes;
  4. Washed walls;
  5. Taped out baseboards, door trim, and other trim;
  6. Applied first coat on walls - let dry;
  7. Lightly sanded walls between coats;
  8. Applied second coat on walls;
  9. Pulled tape and masking paper;
  10. Did touch-ups on ceiling, trim, and walls; 
  11. Painted both sides of the front steel door;
  12. Cleaned up.
Photos:

Upstairs bathroom - Kilim Beige


Downstairs bathroom - Kilim Beige


Upstairs bedroom - Divine White


Upstairs bedroom - Kilim Beige


Upstairs bedroom - Aqua Ocean


Upstairs bedroom - Aqua Ocean


Dining Room


Dining room


 Front door - Tricorn black in satin


Inside view of front door



Downstairs hallway


Living room 

Kitchen


Living room


Master bedroom


Master bedroom


Master bath


Master bath

Wednesday, May 8, 2013

Fishers bedroom and pantry

Finished a bedroom and closet, laundry room, and miscellaneous touch-ups in Fishers on Tuesday. In both the bedroom and laundry room, I painted the ceiling and walls. When I got to the job, the customer had a half dozen other touch-ups - including the closet -  that she asked if I could complete and I agreed.


Steps:
  1. Removed electrical plates;
  2. Sanded walls;
  3. Washed the walls with simple green;
  4. Filled a lot of fairly large holes created when the wire shelves were removed from the laundry room and the bedroom closet. I had to fill several times in order to ensure they didn't show once I applied the eg-shell;
  5. Masked out entire floor with durable paper in order to keep any drips off the carpet in the bedroom and the tile floor in the laundry room;
  6. Painted ceilings;
  7. Painted trim in laundry room;
  8. Taped out baseboards, door trim, and other trim;
  9. Applied first coat on walls - let dry;
  10. Applied second coat on walls;
  11. Pulled tape and masking paper;
  12. Did touch-ups requested;
  13. Cleaned up and presented to customer.
Photos:

Bedroom



Bedroom

Laundry room


Laundry room

Thursday, April 18, 2013

Fishers bedroom and bathroom

Finished a bedroom and bathroom in Fishers on Wednesday. I prepped and applied two coats of eg-shell in a gray color (Sherwin Williams' Mineral Deposit) on the walls only.


Steps:
  1. Removed electrical plates;
  2. Sanded walls;
  3.  Masked out floor with 12 inch paper and additional heavier paper;
  4. Spackled a lot of nail pops and other small holes;
  5. Washed walls;
  6. Taped out baseboards, door trim, and other trim;
  7. Applied first coat on walls - let dry;
  8. Applied second coat on walls;
  9. Pulled tape and masking paper;
  10. Did touch-ups on ceiling, trim, and walls;
  11. Cleaned up. 
Photos:





Friday, April 12, 2013

Carmel master bedroom

Finished a master bedroom in Carmel on Tuesday. I prepped and applied two coats of eg-shell in a gray color on the walls only. I also painted part of the sunken ceiling.  The customer supplied the paint - Lowe's Valspar Signature Interior.


Steps:
  1. Removed electrical plates;
  2. Sanded walls;
  3. Washed walls;
  4. Taped out baseboards and door trim;
  5. Taped out main ceiling because it was a flat ceiling;
  6. Masked out floor with 12 inch paper and additional heavier paper;
  7. Applied first coat on walls - let dry;
  8. Applied first coat to sunken ceiling;
  9. Applied second coat on walls;
  10. Applied second coat on sunken ceiling;
  11. Pulled tape and masking paper;
  12. Moved furniture back in place; and
  13. Did touch-ups on ceiling, trim, and walls;
  14. Cleaned up. 
Challenges:
I also painted part of the sunken ceiling in order to break up the white. This was a challenge because I had to keep paint off the rest of the ceiling.

Photos:

Best view of sunken ceiling with gray paint


 Walls


Another view of walls and ceiling


Fishers bedroom

Finished a small bedroom in Fishers on Tuesday. I prepped and applied two coats of satin in a blue color to the walls only.  The customer supplied the paint - Lowe's Valspar Signature Interior Satin.

Steps:
  1. Moved most of the furniture out of room;
  2. Removed electrical plates;
  3. Sanded walls;
  4. Washed walls;
  5. Taped out baseboards and door trim;
  6. Masked out floor with 12 inch paper;
  7. Applied first coat to walls - let dry;
  8. Applied second coat to walls;
  9. Pulled tape and masking paper;
  10. Did touch-up to walls and trim;
  11. Moved furniture back in place; and
  12. Cleaned up.


Challenges:
Moving furniture around in order to get to the walls.

Photos:






Wednesday, April 3, 2013

Fishers large interior painting project

I just finished a painting project for a customer who is putting her house up for sale. I have done various other painting for this customer over the past three years and she called me when she needed to repaint the rest of her rooms. I painted her master bathroom, guest bathroom, entryway, living room, dining room, office, hallways, and laundry room. I also pressure washed her deck and outside entryway and touched up a lot of the trim and ceilings at no cost. So this was a large project and took me four days to complete by myself.

For the walls, I used Sherwin Williams ProMar 200 in a flat sheen and the color was Kilim Beige for most of the rooms. I did use Soften Green for her master bath, which was the same color as her master bedroom that I painted three years ago.

Steps:
  1. Sanded all the walls;
  2. Washed all the walls;
  3. Spackled all the holes and other dings;
  4. Lightly sanded all the areas I spackled with 220 grade sandpaper;
  5. Taped out all the trim in order to keep paint off the trim;
  6. Applied first coat of paint and let dry for 4 hours;
  7. Applied second coat of paint;
  8. Pulled all the tape;
  9. Touched up trim and ceilings around the house;
  10. Vacuumed;
  11. Pressure washed the deck and front outside entryway.
 Challenges:

1 - A lot of preparation including wall repair and cleaning;

2 - Furniture moving.

Finished Photos:

Dining room


Guest bathroom


 Entryway


Downstairs hallway

 Living room



Hallway leading to entryway

 Living room


 Master bathroom (Soften Green)

 Master bathroom